![]() | Curtain wall installation is one of the most time-sensitive and high-risk parts of commercial construction projects. Every day your glazing crew spends on site costs thousands of dollars in labor and project overhead, and damaged glass units can delay the entire project by weeks. Traditional disposable packaging leads to hours of unboxing waste, site clutter, and unnecessary damage, while the risk of injury from handling heavy glass on site is constant. AGrack solves all these problems, cutting your on-site installation time by 40% or more. |
The Pain Points of Curtain Wall Site Logistics
Traditional curtain wall glass delivery creates massive inefficiency on construction sites:
- Hours of Unboxing Time: Crews spend 3-4 hours per load unboxing custom glass units, disposing of packaging waste, and cleaning glass before installation.
- High On-Site Damage Rates: Moving glass multiple times from delivery truck to staging area to installation point leads to 3-5% damage rates on site, requiring emergency reorders that delay projects by weeks.
- Site Clutter and Safety Risks: Piles of wooden packaging waste create tripping hazards and fire risks on already crowded construction sites.
- Inefficient Installation Flow: Glass units are often delivered in random order, requiring crews to search for the right unit for each opening, wasting valuable installation time.
For a typical 50-story commercial tower, these inefficiencies add up to 2-3 extra weeks of glazing time and hundreds of thousands of dollars in extra labor and delay costs. AGrack’s unitized delivery system eliminates all these pain points.
AGrack for Curtain Wall Installation: Direct to Workface Delivery
AGrack transforms curtain wall site logistics by creating a single unitized container that moves glass directly from your factory to the installation workface, with zero intermediate handling.
1. Cut On-Site Handling Time by 40%
With AGrack, glass units are loaded into the rack at your factory in the exact installation order. The sealed rack is delivered directly to the building hoist or crane lifting point, where it is lifted directly to the installation floor. Crews can access glass units directly from the rack without any unboxing, sorting, or cleaning, cutting handling time by 40% and eliminating all packaging waste on site.
All packaging waste stays at your factory, eliminating the cost and time of hauling construction debris off the job site, and keeping the work area clean and safe for all trades.

2. 90% Reduction in On-Site Damage
Glass units are protected by the full steel AGrack frame and EPDM rubber padding throughout transport and lifting to the installation floor. The zero-scratch mechanical rubber system ensures units arrive in perfect condition, with no damage from vibration, shifting, or moisture during transport. Our curtain wall customers report on-site damage rates dropping from 3-5% to less than 0.3% after switching to AGrack, eliminating costly reorders and project delays.
3. Sequence Loading for Perfect Installation Flow
We work with your project planning team to design custom loading sequences that match your installation schedule. Glass units are loaded into AGrack units in the exact order they will be installed, so your crew always has the right unit available exactly when they need it, no sorting or searching required. This eliminates idle time and keeps your installation crew working at maximum efficiency.

4. Easy Empty Rack Return for High-Rise Projects
Once empty, AGrack folds flat to 20% of its operational size, so you can fit 5 empty racks in a single building hoist load for return to the ground. This eliminates the need to lower large, bulky fixed racks down the building facade with a crane, saving crane time and reducing safety risks on site. Empty racks can be returned to your facility in bulk for the next project.
Frequently Asked Questions
Q: Can AGrack be lifted with standard construction cranes and hoists?
Yes. All AGrack units come with certified lifting lugs that are compatible with standard construction crane hooks and building hoist loading systems.
Q: Can you custom size AGrack for our custom curtain wall unit dimensions?
Absolutely. We design custom AGrack units to perfectly fit your exact curtain wall unit dimensions, including oversized units for full floor heights.
Q: Do we need to buy racks for each project, or can we rent them?
We offer flexible rental options for short-term projects, so you only pay for the racks for the duration of your construction schedule, no long-term capital investment required.
Q: Will AGrack work with our unitized curtain wall system?
Yes. AGrack can be custom designed to hold fully assembled unitized curtain wall panels as well as individual glass units, providing complete protection for pre-assembled panels during transport and lifting.
GET IN TOUCH
Please Don’t Hesitate If You Have Any Questions Or Special Requirements Fill In The Form Below!
Request a Factory-Direct Price Quote
Get customized CAD drawings, dynamic loading calculations, and wholesale price quotes. Response within 12 hours.