WhatsApp Telegram
CONTACT
IGU / Curtain Wall Site Delivery

Grack IGU Curtain Wall Site Lifting and Delivery Glass Storage Rack

For curtain wall contractors and IGU manufacturers, Grack keeps one rack in the flow from plant floor to tower crane: four top lifting pins for balanced hoists, forklift pockets for pallet trucks and forklifts, ratchet straps for load control, divider bars for mixed sizes, and an optional hot-dip galvanized finish for muddy outdoor sites.

Request Site-Ready Quote
Crane lifting a blue L-frame glass transport rack loaded with massive glass panels at a skyscraper construction site

Built for the handoff between factory, truck, and tower crane

This page is for the projects where the rack must do real site work: IGU and curtain wall panels that need to be loaded, tied down, hoisted, delivered, and returned on the same asset. It fits when you need 4-point synchronized lifting, level-floor forklift or pallet-jack transfer, and edge protection that keeps the glass off bare steel. It is not the right choice for single-point hoists, unstable ground without a lift plan, or static storage only.

Field questions, answered directly

What the rack must do on site

These are the points curtain wall teams normally ask before they release a lifting plan or approve a delivery rack.

Compare lifting, transfer, protection, and finish options below.
QuestionGrack methodOn-site note
How are the lifting pins used?Lift with all four top pins at the same time so the load stays balanced under the crane.Use a matched sling set and a qualified lift plan; never single-point lift.
How do forklift pockets and pallet jacks enter?The base channels are made for forklift entry and level-ground pallet-jack transfer.Only use on even ground with enough channel clearance; do not drag across rough slopes.
How is IGU edge damage reduced?Glass rests on steel-core rubber pads and is held back with ratchet straps.Keep the panel slightly rear-leaning and avoid metal-to-glass contact.
How are mixed sizes separated?Use divider bars, restraint bars, or load zoning to split sizes and thicknesses.Put larger and heavier panels to the rear and keep smaller pieces from sliding sideways.
Why choose hot-dip galvanizing outdoors?When the rack sits in rain, mud, or open yards, the zinc layer is the safer corrosion barrier.Powder coat is fine indoors; galvanizing is the better fit for wet, muddy, or long-term exposed sites.
Blue L-frame racks loaded with various sizes of sheet glass in a glazing fabrication facility

What to confirm before you release the rack

Confirm panel size, panel weight, crane sling plan, forklift pocket clearance, ground condition, and whether the rack will live indoors or outdoors. That is the difference between a safe lift plan and a rack that only looks right on paper.

  • Four-point lift compatibility
  • Forklift and pallet-jack base access
  • Optional hot-dip galvanizing for exposed yards
Review Your Lift Plan
Use case details

Lift, transfer, protect, and finish in one workflow

The product only makes sense when the plant rack, the truck leg, and the tower-crane leg are all part of the same delivery cycle.

Four-point lift: how the pins work

The top lifting pins are for a synchronized four-point lift, not for a single hook shortcut. When the slings are matched and the lift plan is balanced, the rack stays upright while the crane takes the load. That is the correct way to move a loaded rack on a high-rise site. If the crew cannot confirm the sling layout, do not lift.

Empty green steel L-frame storage rack render showing top lifting pins and 4-way forklift entry

Forklift pockets, IGU protection, and mixed-size zoning

The base channels let a forklift or pallet jack take the rack on level ground, which is why the same asset can move from staging area to loading bay without a handoff to another carrier. IGU edges stay off bare steel because the panels sit on steel-core rubber pads and are secured with ratchet straps. When the shipment mixes sizes or thicknesses, divider bars and rear-to-front load zoning keep smaller panels from drifting and chipping. For rain, mud, salt, or long outdoor idle time, specify hot-dip galvanizing instead of a standard powder coat.

Blue L-frame steel glass transport racks with pink ratchet tie-down straps securing glass sheets for logistics

When Grack fits

Use it when the job needs one rack to cover factory transfer, truck delivery, and tower-crane lift for IGU or curtain wall glass.

When to choose the galvanized option

Choose hot-dip galvanizing for outdoor yards, muddy sites, salt exposure, or long idle storage. For dry indoor circulation, powder coat is usually enough.

Send the panel size, lift plan, and site condition

If you need the base rack, the return-flow version, a live case, or more field proof, review PDP-01, PDP-05, CASE-03, and SOCIAL-06, then send the glass size, weight, and ground condition.

Contact Us for a Site-Ready Quote
Email
get a quote
whatsapp