Early-stage façade sites do not have smooth floors. They have broken concrete, loose stone, rebar stubs, and mud in the wrong places. This Gstruck solution uses the GL-LD-800plus rough-terrain setup to keep heavy glass moving without turning every bump into a cracked panel or a stuck machine.

The site is not ready when the first curtain wall units arrive. Basement slabs are still rough. Floor surfaces are uneven. There are steel stubs, broken concrete, and wet patches in the travel path. A light wheeled cart can get trapped in the soft section, and a panel that is already under tension can take the shock and crack on the way to the opening.
Project Requirements & Site Scenarios
This solution fits new-build commercial projects where the interior work starts before the ground is fully finished. The machine has to cross rough concrete, carry heavy glass through partially cleared routes, and stay stable when the crew needs the last correction at the opening. That is why the rough-terrain version matters. The machine cannot act like a hand truck. It has to behave like a rigid lifting platform with predictable wheel contact and controlled hydraulic movement.
For this application, the GL-LD-800plus is the right base model. It gives the crew enough load capacity for large curtain wall units, enough height for multi-floor work, and enough wheel diameter to move across the kind of floor that usually stops standard small-wheel equipment.

Technical Parameters Used In This Solution
| Technical Characteristic | Gstruck Parameter Specification |
|---|---|
| Machine Type | Self-propelled vacuum glazing robot for rough-site façade work |
| Model Range | GL-LD-800plus |
| Rated Load | 800 kg class in the retracted working position; confirm every move against the working range diagram |
| Max Lift Height | 5 m |
| Wheel System | 480 mm large-diameter pneumatic off-road tires |
| Power Source | Lead-acid battery |
| Vacuum Safety | Dual vacuum reservoirs with automatic pressure hold |
| Suction Configuration | 4 to 10 silicone suction cups, 300 mm diameter each |
| Head Movement | 360° rotation, ±90° forward/backward tilt, up to 150° side rotation |
| Fine Correction | 100 mm lateral shift for final alignment |
| Structure | Q235A structural carbon steel, laser-cut and fully welded |
| Control Method | Wireless remote operation for close visual control at the opening |
| Control System | Curtis controller for smooth proportional movement |
Why This Machine Handles Rough Ground Better Than Small-Wheel Carts
The failure mode on rough sites is simple. Small wheels drop into pits, get trapped between chunks of concrete, or pass every bump straight into the glass. Once the panel starts shaking, the crew has two bad choices: slow down until the job becomes painful, or force the move and risk damage. The GL-LD-800plus avoids that trap by using a bigger pneumatic tire, a heavier steel chassis, and hydraulic motion that does not depend on loose mechanical push-and-pull handling.
The load is held by the vacuum frame, not by a strap rubbing on an edge. The chassis stays rigid while the operator uses remote control for the last move. That gives the job a clean mechanical path from pickup to opening, even when the floor below is still ugly.

Operating Sequence For Rough-Site Curtain Wall Installation
The crew clears a travel line, confirms that the panel surface is clean and dry, and brings the robot to the glass with remote control. The machine picks the lite, carries it across the rough route, and stops where the opening can be seen clearly. At that point the boom, tilt, and side-shift functions do the last correction without forcing the chassis to hunt for position.
If the panel is heavier than the 800 kg class or the required working reach starts to exceed the safe envelope, the job should move to the larger GL-HD-1000 class rather than forcing the 800plus to cover the wrong load range.
Risk Controls That Matter On This Application
- Do not force the machine through boggy sections where the wheels can sink.
- Check the working-range diagram before moving any heavy panel.
- Confirm the glass surface is clean and dry before the vacuum hold is trusted for lifting.
- Keep the route clear of loose rebar, sharp debris, and uneven steps that can shock the panel.
- Use the 100 mm side shift for final correction instead of moving the whole machine sideways at the edge.
Operations Insight: Rough sites punish light equipment and vague planning. The machine needs enough wheel diameter, enough chassis rigidity, and enough control at the opening to keep the panel calm from the first pickup to the final line.