Mgrack · Double-Sided A-Frame Rack
Panels per face = usable side width ÷ (panel edge thickness + pad and gap allowance) × tiers. When a face is full, the next move is a linked second bay: main bay and slave bay bolt together into a rack group at the same working height, without a structural rewrite.
Two ceilings decide how many panels a single double-sided A-frame rack can hold. The first is geometric: the usable side width of one face divided by the panel thickness plus the pad and gap allowance, multiplied by the number of tiers you load. The second is physical: the total weight that face puts on the base, the casters and the floor, and where that weight puts the centre of gravity. A rack sized around 6 mm lites at 2 m is not the same rack as one sized around 25 mm laminated units, so no single published figure is honest across every build. The arithmetic is the same for both; the inputs are what change.
That is why this answer is a method rather than a number. Work the face, check the load it creates, and only then decide whether the next step is a second bay or a taller frame. The order matters: a bay added on top of an already overloaded face multiplies the same fault. Every value the method uses is fixed on the drawing at order confirmation against your own panel and your handling method — we do not publish one capacity number that applies to every Mgrack build.
Step one — work the face before you count the racks
Take the usable seating width on one face and divide it by the panel edge thickness plus the pad and gap allowance. A 25 mm laminated edge with a 6 mm pad-and-gap allowance gives a 31 mm divisor; whatever that divisor fits across the usable width, multiplied by the tiers you load, is the count for that face. The two faces are counted separately, and the more heavily loaded face governs the rack. What the method does not do is let you widen a face to fit more panes without re-checking the centre of gravity, or carry a count across panel types. A face loaded with 6 mm lites and a face loaded with laminated units are two different counts on the same frame geometry — which is why the edge thickness and the heaviest pane are the first two questions in a quote.

Step two — a linked second bay beats a taller frame
When a face is full and the throughput still does not fit, add a bay, not height. The main bay and the slave bay share the same A-frame geometry and are joined at the base rails and the top beam, so the group grows sideways in one direction, the working height stays where your operators already handle it, and nothing in the structure has to be re-engineered. You get more faces at a familiar height, no new lifting or tie-down geometry to learn, and empty bays that nest or knock down for the return leg. Choose the second bay over a taller frame when the limit you hit was panel count and not floor space, when the tallest pane already sets the frame height, when the aisle or the door will not pass a taller loaded rack, and when placing or pulling the top pane would mean reaching above the current load height. What a linked bay is not: permission to stack to any height, and not a way to skip re-checking the load each added face puts on the base, the casters and the floor.
The signals that say the load has outgrown the geometry
Five things show up before anything falls: panes standing proud of the outer contact pad instead of seating on it; the frame swaying or a caster lifting off the floor when the rack is pushed; tie-down straps that need retensioning every shift; contact pads flattened through to the steel at the high-load positions; and one corner that rolls noticeably harder than the others. Treat those as a load problem, not a rack problem. Correct the panel count, the seating or the base before you add a bay or a tier.

What to send for a panel count and a bay count
- Panel edge thickness, plus the largest panel width and height you run
- Unit weight per pane, with the heaviest pane named separately
- Tiers you intend to load per face, and whether both faces carry the same panel
- Handling method — hand push, caster move, forklift entry or overhead lift — with aisle, door and floor limits